Second round of groundwater reporting workshops for Tulare and Kings counties farmers upcoming
The state will hold three more workshops to help landowners in Kings and Tulare counties comply with a Feb. 1 deadline to report their groundwater pumping.
The workshops will go over the Water Resources Control Board’s online portal known as GEARS.
Workshop dates and times are:
- Dec. 9, 10 a.m. to 1 p.m. at the Pixley Branch Library, 927 South Center St. #B
- Dec. 9, 4:30 p.m. to 7 p.m. at the Allensworth Elementary School, 3320 Young Rd.
- Dec. 10, 9 a.m. to 2 p.m. at the Lemoore Veteran’s Hall, 411 West D St.
Farmers in the Tulare Lake subbasin, which covers most of Kings County, are required to report groundwater extractions from Oct. 1, 2025 through Sept. 30, 2026.
Meanwhile, farmers in the Tule subbasin, which covers the southern half of Tulare County’s flatlands, are required to report groundwater extractions from Jan. 1, 2026 through Sept. 30, 2026.
Both regions were placed on probation by the Water Board in 2024 for lacking adequate groundwater plans that would quell subsidence, or land sinking, among other deficiencies.
Under probation, farmers are required to meter and register their wells annually at $300 each , report extractions and pay $20 per acre foot of groundwater pumped.
However, landowners who pump fewer than 20 acre feet per year, are excluded from the reporting and fee requirements.
Landowners who need additional help may schedule an appointment with Water Board staff here.
